|
| |
INDUSTRIAL PROJECTS BY
MDM
-
CENTRAL COAST JET CENTER, Santa Maria: 17,500 SF,
two story. Design and construction documents for an aircraft hangar and
office support space.
-
MAINLINE AUTOBODY, Santa
Maria: 20,000 SF, two story. Design and construction documents for an
autobody shop and office support.
-
MAIN STREET PRODUCE, Santa Maria: 9,300 SF, one story.
Design and construction documents of a cold storage agricultural warehouse.
- WATER GEAR, INC., Santa Maria: 23,000
SF, one story, office and warehouse.
-
LANDFILL MAINTENANCE/STORAGE, Santa Maria: 7,500
SF one story. Equipment maintenance and storage facility for
the SM City Public Works Department.
- MELFRED BORZALL, INC., Santa Maria: 30,000 SF, two story, manufacturing facility.
- CYPRESS RIDGE GOLF, Arroyo Grande:
Maintenance and golf cart storage buildings.
- GREENHEART FARMS, Nipomo: 11,600 SF,
one story, seedling production facility.
- SANTA MARIA DIESEL, Santa Maria:
27,000 SF, one story, three buildings, body shop and paint, media blast and
multi-tenant lease space.
- ATLAS PERFORMANCE INDUSTRIES, Santa Maria:
8,700 SF, one story. Office/warehouse.
- ZIERMAN PLUMBING, Santa Maria: 4,000
SF, one story. Plumbing business facility.
- CAL FARMS, Los Alamos: 3,200 SF, one
story. Vineyard support structure.
- BAR Z RANCH, Santa Maria: 17,000 SF,
one story. Hay storage building.
- SANTA MARIA CEMETERY, Santa Maria: 10,000 SF, one story. Ag maintenance building.
INDUSTRIAL PROJECTS WHILE
EMPLOYED BY OTHERS:
- MICRON TECHNOLOGY TREATMENT FACILITY, Boise,
ID (Ehrlich Rominger): 12,000 SF, one story. Facility developed for
treatment of process water use in microchip manufacturing. Responsible for
construction documents.
- P.E. O'HAIR, Bakersfield
(Hall-Hurley-Deutsch): 40,000 SF, one story. Pipe and supply wholesale
warehouse and yard. Responsible for design through construction
administration.
- P.E. O'HAIR, Santa Maria
(Hall-Hurley-Deutsch): 20,000 SF one story. Pipe and supply wholesale
warehouse and yard. Responsible for design through construction
administration.
- GALLISON BUILDING, Santa Maria
(Hall-Hurley-Deutsch): 5,000 SF, one story. Tilt-up concrete, light
industrial. Responsible for schematic design.
- BLOSSER INDUSTRIAL PARK, Santa Maria
(Hall-Hurley-Deutsch): 88,000 SF, five building, one story. Industrial
tilt-up complex. Responsible for schematic design and generation of
construction documents.
- MICROWAVE APPLICATIONS GROUP, Santa Maria
(Hall-Hurley-Deutsch): 10,000 SF one story. Tilt-up addition of office and
production space. Responsible for construction documents.
|